How to Certify SRCs

 

Instructions (step-by-step)
 

 

Background
 

If you are new to Stormwater Retention Credits (SRCs) and Off-Site Retention Volume (Offv), please read the SRC Trading program page first for an overview.

Overview

 

  1. Install and maintain green infrastructure (GI) as part of an approved stormwater management plan (SWMP) that details the GI design, either for a voluntary project or to exceed the required Stormwater Retention Volume (SWRv) for a major regulated project. If you plan to sell SRCs, make sure you are building a voluntary project in the MS4 area to qualify as High-Impact SRCs. If you are self-generating SRCs to comply with your own Offv requirement, contact DOEE to make sure that the SRCs you generate match the types and deadlines needed for your Offv requirement. 
     
    To be eligible to certify SRCs, your project must pass a DOEE final construction inspection, have an approved as-built SWMP that has the same retention capacity as the approved plan, pass a construction or maintenance inspection for all BMPs on the plan within the previous 6 months, have a current maintenance agreement with all required components, and comply with application deadlines to certify SRCs (explained later on this page). 
     

  2. Certify the SRCs. You will submit an application in DOEE’s Surface and Groundwater System (SGS) to certify SRCs and attach supporting documents to confirm that you will maintain the GI in good working order for the entire certification period. DOEE staff may contact you for additional information. After approving your application, DOEE will create the SRC serial numbers and email you a confirmation letter for your records. 
     

  3. Continue to maintain the BMPs. You are responsible for maintaining all of the BMPs on a plan that generated SRCs to ensure that GI actually provide the amount of retention capacity you received credit for. DOEE periodically requires GI maintenance documentation and inspections. 
     

  4. Continue to certify the SRCs. Each certification period lasts 1–3 years (depending on the length of your maintenance agreement). At the end of your certification period, you can apply again to certify SRCs from the SWMP for the next 1–3 years. It is important to comply with all application deadlines to prevent SRC eligibility from expiring permanently.

Application deadlines 
 

  • Voluntary projects have no application deadlines. (Note: SRC eligibility has permanently expired for voluntary projects installed before July 1, 2013, that have not already certified SRCs).
     

  • Major regulated projects 

     - First application is due within 3 years after the DOEE final construction inspection date. 
     - Additional applications are due within 3 years after the end of the previous certification period.  
     - Important note: SRC eligibility for a regulated project will expire permanently if you do not certify SRCs by the deadlines for the first or additionalapplications. 

  • For any eligible SRC project, you can apply to certify additional SRCs as early as 3 months before the end of the current certification period.

Who can apply to certify SRCs?

To complete the application to certify SRCs, you must have an account in the SGS, available at doee.dc.gov/SGS. The SRC & Offv section of the SGS has information about your SRC & Offv portfolio, including upcoming deadlines, application instructions, and your assigned DOEE contact. It’s best to discuss your options and the process with your DOEE contact before you get started.

 

A site owner can authorize another party (for example an “SRC Aggregator”) to use their property install a GI project to generate SRCs. Typically, this arrangement is a partnership where the SRC Aggregator intends to sell High-Impact SRCs. Please coordinate with DOEE to set up the correct SGS access for SRC Aggregators.

 

The site owner or SRC Aggregator is eligible to apply to certify SRCs and will be set up with the required SGS access to be the SRC owner. The SRC owner can also delegate SGS access to "staff” of the SRC owner’s SGS organization account or an “agent” with permission to manage their SRC portfolio. 

 

When you sign up for an SGS account, use the comment box on the registration form to describe the access you need. If you are a new site owner, be prepared to provide proof of ownership. If you already have an SGS account and need to set up access, please contact [email protected]. 

 

How many SRCs can I generate?

The amount of SRCs you can generate depends on two things: 
 

  • SRC eligibility in the approved plan – A project that meets all the application requirements can certify the annual amount of SRC eligibility (in gallons) specified in the approved SWMP. The SGS calculates the gallons of SRC eligibility based on the project design information the engineer enters during the plan submission and review process.  
     

  • Period of your GI maintenance agreement – You can generate SRCs for 1–3 years of SRC eligibility at once, depending on the maintenance contracts and documentation you provide. When an SRC certification period is coming to an end, you can provide new GI maintenance documentation to DOEE to request to certify 1–3 years of new SRCs. You can repeat this cycle as long as you maintain the GI in good working order.  For plans that also have gray infrastructure installed, those practices must be included in the maintenance agreement.

SRC Limitations Policy

For projects that received DOEE funding to install green infrastructure after June 19, 2013, there is an initial period where the project is only able to certify 50% of the SRC eligibility per year until DOEE recovers its investment. View the SRC Limitations Policy.


 

 

 